To modify a replication schedule:

  1. Open the node Replication Schedule in the tree and select the replication schedule that is to be modified. The following screen is displayed.

  2. Click the Modify button. All the replication schedule information is displayed. The Target Database name and Database Type are disabled and they cannot be modified.

  3. The User Name can be changed.

  4. By clicking Suspend, you can change the status of the replication schedule to suspend. Once the status of the replication schedule is changed to suspend, you can click Resume to change the status to OK.

  5. The Begin Time of the replication schedule can be modified.

  6. The interval of time in which replication has to be done, the number of days and time interval can be modified.

  7. The number of times to Retry and the interval of time between 2 consecutive retries can also be modified.

  8. Replication is to be Stopped on Error can be changed to Yes or No.

  9. The With no Check button is disabled; whether or not schema is to be checked before replication cannot be changed.

  10. Click Confirm.

  11. Click the Synchronous button to synchronize replication. A window is opened as shown.

  12. Click the Wait option button or click the No Wait option.

  13. Click OK.


Related topic:

Modifying a Replication Schedule